A Trail For All
The Great Redwood Trail (GRT) will connect Humboldt Bay to San Francisco as a world-class rail-trail.
Strengthen
Community Connections
Enjoy California’s
Iconic Landscapes
Support
Environmental Restoration
Experience a Trail for All
The Great Redwood Trail Agency (GRTA) is a public agency created by the State of California to develop and manage the Great Redwood Trail (GRT) in Humboldt, Mendocino, and Trinity counties.
Rivers & Redwoods
Enjoy camping and recreation, like rafting, kayaking, etc. in backcountry areas along remote rivers.
History You Can Ride & Walk
Discover vintage railroad bridges and deep mountain tunnels transformed into a scenic trail for cyclists and hikers.
Shaped by Its Communities
The GRT offers experiences shaped by the communities and landscapes it passes through.
Everyday Connections
In Mendocino and Humboldt counties, the trail links people to schools, jobs, parks, and local destinations.
SF Bay → Humboldt Bay
Impact of the Trail

Economic Benefits & Community Life

Connected Trail Network

Environment
About GRTA
GRTA’s service area is the former North Coast Railroad Authority (NCRA) rail corridor in Mendocino, Trinity, and Humboldt Counties. The rail corridor in Sonoma and Marin Counties was transferred to Sonoma–Marin Area Rail Transit (SMART) in 2022.
See Where We’ve Been Featured
Common Questions
When will the Great Redwood Trail be ready, or is there a completion date?
There’s no single completion date for the whole 300+ mile trail. The GRT is being developed segment by segment, typically in 3- to 10-mile projects, as GRTA and local partners secure funding, complete environmental review, and finish design and permitting for each piece. Some sections are already open to the public (in and around Ukiah, Willits, Eureka, and Arcata, for example), some are under construction or in active planning, and many more are still “proposed.” Given the trail’s remote and geologically challenging terrain, especially through the Eel River Canyon, with its 28 tunnels and dozens of aging bridges and trestles, a fully connected trail could take decades to complete.
Master Plan source
Ch. 6 (Table 21, Prioritization Results), Ch. 7.1 Overview, p. 26 “What’s Next”
Where can I find a map of the trail, or a schedule of what’s being built when?
You can access a public, trail-wide map and project tracker on our website. Information can also be found in the Master Plan’s Appendix E (“Project Mapbook”), which includes maps and details for each of the trail’s 43 planned segments, and Chapter 6 (Table 21) shows each segment’s status — existing, under construction, planned, or proposed — and priority tier. As individual segments move into design and construction, we’ll post updated maps and details for that specific area.
Master Plan source
Appendix E: Project Mapbook; Table 21 (p. 282)
Is the Great Redwood Trail a walking trail, a bike trail, or a train?
It depends on where you are. In Marin and Sonoma Counties (the trail’s southern segment), SMART (Sonoma-Marin Area Rail Transit) is building a “rail-with-trail,” which is a paved multi-use pathway alongside its passenger train. From the Sonoma/Mendocino County line north through Mendocino, Trinity, and Humboldt Counties, GRTA is developing a trail-only corridor with no train service. Along the whole route, the trail itself is a shared, multi-use path for walking, biking, and (in most areas) horseback riding.
Curious about a specific section of the trail? Check out our interactive map.
Master Plan source
p. 3 (SMART/GRTA segment overview), Glossary “Rail-with-Trail”

